2BE203 water ring vacuum unit
> < >

Product introduction Product introduction
National free consultation hotline: 400-6064-114

ZF series vacuum pump station (also known as vacuum generating device, vacuum station, negative pressure station, vacuum negative pressure station, etc.) uses one or two water ring vacuum pumps (or other forms of vacuum pumps) as vacuum obtaining equipment, and vacuum tanks as vacuum Complete system of storage equipment. In the case of frequent use of a vacuum source and a small amount of suction is required, the system saves energy greatly and directly improves the service life of the vacuum pump than using a vacuum pump directly.
This equipment can provide vacuum sources for medical gas central stations for various large and medium-sized hospitals in China, and is widely used in vacuum stations in the chemical and pharmaceutical industries, canning systems in the light industry, and negative pressure molding of rubber and plastic engineering parts in the automotive industry. Flame retardant for coal mine
Vacuum source for impregnation and casting industries (V-method, V-EPC), etc.
1. After the device is started for the first time, the entire operation process can be fully controlled. In the course of its work, the vacuum degree of each place in the vacuum system always fluctuates up and down within its allowable range, and its fluctuation range can be adjusted according to user requirements.
Second, the device can be widely used in various types of systems that require vacuum. At the same time, it can also automatically control the system without any operation; it can automatically close the vacuum system when the power is off. Using this equipment can make your vacuum system more advanced, safe and energy efficient.
3. The device is equipped with a gas-water separator (when the equipment is equipped with a water ring vacuum pump), which can save water resources and reduce environmental pollution.

First set the upper and lower limits of the vacuum system (for example, the upper limit is set to -0.08MPa and the lower limit is set to -0.06MPa). After the system starts, one of the vacuum pumps starts to work until the vacuum in the vacuum tank The vacuum degree is higher than the set upper limit value -0.08MPa. At this time, the vacuum pump stops automatically, and the vacuum in the vacuum tank is automatically cut off by the automatic check valve. If the vacuum degree in the vacuum tank falls below the lower limit value -0.06 due to work requirements At MPa, another vacuum pump is automatically started until the vacuum in the vacuum tank reaches the upper limit of -0.08 MPa. This cycle is repeated and automatically operated to keep the vacuum in the vacuum tank between the upper and lower limits.
Two-pump vacuum pumps can also be made into one-use and one-standby type.

model

Vacuum tank volume

Recommended vacuum pump

Total power

Vacuum degree fluctuation range

Ultimate vacuum

m3

(Water ring vacuum pump)

( KW )

Mpa

Mpa

ZF-0.3A

0.3

× 2 2BV2060 × 2 units

2.2

-0.09 0 -0.09

-0.097

ZF-0.3B

0.3

× 2 2BV2061 × 2

3

-0.09 0 -0.09

-0.097

ZF-0.5A

0.5

× 2 2BV2061 × 2

3

-0.09 0 -0.09

-0.097

ZF-0.5B

0.5

× 2 2BV2070 × 2

6

-0.09 0 -0.09

-0.097

ZF-1A

1

× 2 2BV2061 × 2

3

-0.09 0 -0.09

-0.097

ZF-1B

1

× 2 2BC2070 × 2

6

-0.09 0 -0.09

-0.097

ZF-1C

1

× 2 2BV5110 × 2

8

-0.09 0 -0.09

-0.097

ZF-1.5A

1.5

× 2 2BV5110 × 2

8

-0.09 0 -0.09

-0.097

ZF-1.5B

1.5

× 2 2BV5111 × 2

11

-0.09 0 -0.09

-0.097

ZF-1.5C

1.5

× 2 2BV5121 × 2

15

-0.09 0 -0.09

-0.097

ZF-2A

2

× 2 2BV5111 × 2

11

-0.09 0 -0.09

-0.097

ZF-2B

2

× 2 2BV5121 × 2

15

-0.09 0 -0.09

-0.097

ZF-2C

2

× 2 2BV5131 × 2

twenty two

-0.09 0 -0.09

-0.097

ZF-3A

3

× 2 2BV5121 × 2

15

-0.09 0 -0.09

-0.097

ZF-3B

3

× 2 2BV5131 × 2

twenty two

-0.09 0 -0.09

-0.097

ZF-3C

3

× 2 2BV5161 × 2

30

-0.09 0 -0.09

-0.097

ZF-5A

5

× 2 2BV5131 × 2

twenty two

-0.09 0 -0.09

-0.097

ZF-5B

5

× 2 2BV5161 × 2

30

-0.09 0 -0.09

-0.097

ZF-5C

5

× 3 2BV5161 × 3

45

-0.09 0 -0.09

-0.097



One, Connect the exhaust pipe according to the engineering requirements, The device is uniformly installed on a steel chassis, Inspect all equipment for damage during transportation and the entire chassis is installed horizontally.

2. Assemble the control cabinet, connect the motor according to the terminal number of the electrical schematic diagram, and connect the electric contact vacuum gauge.

3. Inject tap water into the gas-water separator and add it to the overflow pipe. Before starting the water ring pump, you must jog the motor to start the test. 以免泵内生绣(详见水环泵使用说明书) When not in use for a long time, drain the water in the pump to avoid embroidery inside the pump (for details, refer to the instruction manual of the water ring pump) . If other types of vacuum pumps are used, please refer to the relevant instruction manual for usage.

整定电接点真空表上的真空度范围, 将下限按照各自要求的真空度调节指针到要求刻度处,考虑来自系统的泄露或工作损失,适当整定其上限刻度,以免泵的开停过于频繁。 4. Set the vacuum range on the vacuum gauge of the electrical contact , adjust the lower limit to the required scale according to the required vacuum degree, and consider the leakage or work loss from the system. Set the upper limit appropriately to prevent the pump from starting and stopping too frequently .

电控柜送电前, 首先摇测设备绝缘电阻≮ 10M Ω, 并且底盘要有良好的接地, 接地线≮ 4mm2 ;送电后合上空气开关,先手动启动两电机工作正常后,再将万能转换开关置于自动档,检查其工作程序,使其实现全自动控制。 V. Before powering on the electric control cabinet, first test the insulation resistance of the device ≮ 10M Ω, and the chassis must be well grounded, and the grounding wire ≮ 4mm2 ; after powering on, close the air switch, start the two motors manually, and then Put the universal transfer switch in the automatic position and check its working procedure to make it fully automatic. -0.08MPa Sixth, the airtight inspection of the equipment, the system valve should be closed, the vacuum gauge should reach -0.08MPa after air extraction .

7. Regularly add grease to the oil cup of the water ring pump to ensure the lubrication performance of the bearing.

Troubleshooting and repair form Troubleshooting and repair form

Serial number

Common malfunctions

Cause and repair

1

System vacuum is low

Check if the vacuum pipeline is leaking, check whether the valve is normal, and the water ring pump is installed incorrectly (according to the water ring pump instruction manual)

2

Water ring pump is not working properly

Close the pipeline and waterway, and repair the vacuum pump. And check whether the water supply is normal, whether water is added and the amount of water.

3

Automatic control failure or control failure

Check the circuit according to the schematic diagram of the electrical appliance, whether the electrical contact vacuum meter wiring is loose or disconnected, whether the power supply is normal, and whether the AC contactor of the control cabinet is damaged.

4

Motor Weng ring, do n’t turn

The three-phase motor is out of phase. Check whether the three-phase power supply in the control cabinet is normal and whether the three-phase wire of the motor is falling off.

5

Noisy vacuum pump

系列真空泵工作在极限时会发出汽蚀声, 如噪音较大须打开汽蚀保护口。 The 2BV series vacuum pump will emit cavitation sound when working at the limit. If the noise is loud, the cavitation protection port must be opened.